Here's where things have got to at this stage;
Suspension and drive is on, brakes are on, loom reattached, all ancillaries reattached.
Left to do:
- Install headers
- Install spark plugs, leads, and plug covers
- Build better mount for the engine bay oil pressure gauge
- Attach clutch heat shield
- Check radiators
- Reinstall engine and reconnect everything
- Recommission brakes, air-con, power steering etc.
- Engine start-up.